Author Question: The sequence of construction operations on a project involving a single general contract is usually ... (Read 117 times)

Zulu123

  • Hero Member
  • *****
  • Posts: 525
The sequence of construction operations on a project involving a single general contract is usually established by the:
 
  A. general contractor.
   B. union.
   C. sub-contractor.
   D. Inspector.
   E. Construction Management firm

Question 2

Under a federal style Type I/Type II Differing Site Conditions clause, who is responsible for the timely removal, relocation, or protection of any existing main or trunkline utility facilities on a project site where such utilities are not shown accurately on the Construction Drawings and could not be observed during a site visit?
 
  A. engineer/architect of design
   B. general contractor
   C. construction manager
   D. Public Agency/owner of the project
   E. Utility company who owns the utility line



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

lolol

  • Sr. Member
  • ****
  • Posts: 330
Answer to Question 1

A

Answer to Question 2

D




Zulu123

  • Member
  • Posts: 525
Reply 2 on: Jul 26, 2018
Wow, this really help


flexer1n1

  • Member
  • Posts: 373
Reply 3 on: Yesterday
Excellent

 

Did you know?

Stevens-Johnson syndrome and Toxic Epidermal Necrolysis syndrome are life-threatening reactions that can result in death. Complications include permanent blindness, dry-eye syndrome, lung damage, photophobia, asthma, chronic obstructive pulmonary disease, permanent loss of nail beds, scarring of mucous membranes, arthritis, and chronic fatigue syndrome. Many patients' pores scar shut, causing them to retain heat.

Did you know?

Excessive alcohol use costs the country approximately $235 billion every year.

Did you know?

Green tea is able to stop the scent of garlic or onion from causing bad breath.

Did you know?

All adverse reactions are commonly charted in red ink in the patient's record and usually are noted on the front of the chart. Failure to follow correct documentation procedures may result in malpractice lawsuits.

Did you know?

Blood in the urine can be a sign of a kidney stone, glomerulonephritis, or other kidney problems.

For a complete list of videos, visit our video library