The streamflow used for designing a water supply reservoir is the
a. flood flow
b. minimum flow
c. one-in-ten-year minimum seven consecutive day low flow
d. average flow
e. none of the above
Question 2
Grit chambers are used to
a. digest organic solids in sewage sludge
b. reduce primary wastewater effluent BOD levels
c. remove suspended solids that may damage equipment
d. remove colloidal solids that cannot be removed by sedimentation
e. none of the above