What are the responsibilities of designers related to construction projects?
 
  What will be an ideal response?

Question 2

What is the first phase in the development of a construction project and what takes place during this phase?
 
  What will be an ideal response?



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

tdewitt

  • Sr. Member
  • ****
  • Posts: 318
Answer to Question 1

Designers are responsible for designing projects and for performing engineering analysis to verify that their designs conform to legal requirements and standards, such as building codes, and to ensure that their designs meet the required factors of safety for each type of structure. Designers coordinate multiple disciplines and agencies and act as the representative of owners as their agent during construction. Designers verify conformance to the contract plans and specifications for owners.

Answer to Question 2

The first phase in the development of a construction project is the feasibility phase. During this phase contracts are formed between an owner and a consultant, an engineering firm, or an architectural firm to perform a feasibility and site selection study.




EAugust

  • Member
  • Posts: 550
Reply 2 on: Jul 26, 2018
:D TYSM


billybob123

  • Member
  • Posts: 336
Reply 3 on: Yesterday
Excellent

 

Did you know?

Serum cholesterol testing in adults is recommended every 1 to 5 years. People with diabetes and a family history of high cholesterol should be tested even more frequently.

Did you know?

There used to be a metric calendar, as well as metric clocks. The metric calendar, or "French Republican Calendar" divided the year into 12 months, but each month was divided into three 10-day weeks. Each day had 10 decimal hours. Each hour had 100 decimal minutes. Due to lack of popularity, the metric clocks and calendars were ended in 1795, three years after they had been first marketed.

Did you know?

Every flu season is different, and even healthy people can get extremely sick from the flu, as well as spread it to others. The flu season can begin as early as October and last as late as May. Every person over six months of age should get an annual flu vaccine. The vaccine cannot cause you to get influenza, but in some seasons, may not be completely able to prevent you from acquiring influenza due to changes in causative viruses. The viruses in the flu shot are killed—there is no way they can give you the flu. Minor side effects include soreness, redness, or swelling where the shot was given. It is possible to develop a slight fever, and body aches, but these are simply signs that the body is responding to the vaccine and making itself ready to fight off the influenza virus should you come in contact with it.

Did you know?

More than 150,000 Americans killed by cardiovascular disease are younger than the age of 65 years.

Did you know?

Pope Sylvester II tried to introduce Arabic numbers into Europe between the years 999 and 1003, but their use did not catch on for a few more centuries, and Roman numerals continued to be the primary number system.

For a complete list of videos, visit our video library