This topic contains a solution. Click here to go to the answer

Author Question: What are the responsibilities of designers related to construction projects? What will be an ... (Read 53 times)

EAugust

  • Hero Member
  • *****
  • Posts: 550
What are the responsibilities of designers related to construction projects?
 
  What will be an ideal response?

Question 2

What is the first phase in the development of a construction project and what takes place during this phase?
 
  What will be an ideal response?



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

tdewitt

  • Sr. Member
  • ****
  • Posts: 318
Answer to Question 1

Designers are responsible for designing projects and for performing engineering analysis to verify that their designs conform to legal requirements and standards, such as building codes, and to ensure that their designs meet the required factors of safety for each type of structure. Designers coordinate multiple disciplines and agencies and act as the representative of owners as their agent during construction. Designers verify conformance to the contract plans and specifications for owners.

Answer to Question 2

The first phase in the development of a construction project is the feasibility phase. During this phase contracts are formed between an owner and a consultant, an engineering firm, or an architectural firm to perform a feasibility and site selection study.




EAugust

  • Member
  • Posts: 550
Reply 2 on: Jul 26, 2018
YES! Correct, THANKS for helping me on my review


cpetit11

  • Member
  • Posts: 321
Reply 3 on: Yesterday
Wow, this really help

 

Did you know?

The average human gut is home to perhaps 500 to 1,000 different species of bacteria.

Did you know?

All adults should have their cholesterol levels checked once every 5 years. During 2009–2010, 69.4% of Americans age 20 and older reported having their cholesterol checked within the last five years.

Did you know?

During pregnancy, a woman is more likely to experience bleeding gums and nosebleeds caused by hormonal changes that increase blood flow to the mouth and nose.

Did you know?

The first oncogene was discovered in 1970 and was termed SRC (pronounced "SARK").

Did you know?

Patients should never assume they are being given the appropriate drugs. They should make sure they know which drugs are being prescribed, and always double-check that the drugs received match the prescription.

For a complete list of videos, visit our video library