Author Question: AE Manufacturing has 60 machine hours every day. AE Manufacturing two products, A and B. When ... (Read 60 times)

arivle123

  • Hero Member
  • *****
  • Posts: 569
AE Manufacturing has 60 machine hours every day. AE Manufacturing two products, A and B. When changing over from producing product B to A, there is no change over time. When changing over from producing product A to B, it takes 8 machine hours. If the previous day ended with producing product B, what is the effective capacity when AE Manufacturing has the following schedule: product A, product B, product A.
 a. 60 machine hours per day c. 44 machine hours per day
  b. 56 machine hours per day d. 52 machine hours per day

Question 2

Given that z is a standard normal random variable, a negative value of z indicates that:
 a. The value z is to the left of the mean.
  b. The value z is to the right of the median.
  c. The standard deviation of z is negative.
  d. The area between zero and z is negative.
  e. The probability associated with z is negative.



Carliemb17

  • Sr. Member
  • ****
  • Posts: 325
Answer to Question 1

D

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question

Carliemb17

  • Sr. Member
  • ****
  • Posts: 325

 

Did you know?

The ratio of hydrogen atoms to oxygen in water (H2O) is 2:1.

Did you know?

Cutaneous mucormycosis is a rare fungal infection that has been fatal in at least 29% of cases, and in as many as 83% of cases, depending on the patient's health prior to infection. It has occurred often after natural disasters such as tornados, and early treatment is essential.

Did you know?

A serious new warning has been established for pregnant women against taking ACE inhibitors during pregnancy. In the study, the risk of major birth defects in children whose mothers took ACE inhibitors during the first trimester was nearly three times higher than in children whose mothers didn't take ACE inhibitors. Physicians can prescribe alternative medications for pregnant women who have symptoms of high blood pressure.

Did you know?

People with high total cholesterol have about two times the risk for heart disease as people with ideal levels.

Did you know?

If you could remove all of your skin, it would weigh up to 5 pounds.

For a complete list of videos, visit our video library