Author Question: Changes made after construction documents are administered usually result in additional costs to the ... (Read 35 times)

aabwk4

  • Hero Member
  • *****
  • Posts: 593
Changes made after construction documents are administered usually result in additional costs to the client.
 
  Indicate whether the statement is true or false

Question 2

A concept sketch is never used for a client presentation.
 
  Indicate whether the statement is true or false



chevyboi1976

  • Sr. Member
  • ****
  • Posts: 344
Answer to Question 1

True

Answer to Question 2

False



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Asthma attacks and symptoms usually get started by specific triggers (such as viruses, allergies, gases, and air particles). You should talk to your doctor about these triggers and find ways to avoid or get rid of them.

Did you know?

When blood is deoxygenated and flowing back to the heart through the veins, it is dark reddish-blue in color. Blood in the arteries that is oxygenated and flowing out to the body is bright red. Whereas arterial blood comes out in spurts, venous blood flows.

Did you know?

Many supplement containers do not even contain what their labels say. There are many documented reports of products containing much less, or more, that what is listed on their labels. They may also contain undisclosed prescription drugs and even contaminants.

Did you know?

Colchicine is a highly poisonous alkaloid originally extracted from a type of saffron plant that is used mainly to treat gout.

Did you know?

Patients should never assume they are being given the appropriate drugs. They should make sure they know which drugs are being prescribed, and always double-check that the drugs received match the prescription.

For a complete list of videos, visit our video library