Author Question: Open plan office spaces should have a ceiling with an NRC rating of at least: .30 .60 .75 ... (Read 79 times)

soccerdreamer_17

  • Hero Member
  • *****
  • Posts: 552
Open plan office spaces should have a ceiling with an NRC rating of at least:
 
   .30
   .60
   .75
   .80 or higher

Question 2

A door assembly with an STC rating of 40 should:
 
   Be matched with a wall assembly of the same STC
  rating
   Be made from steel
   Be have gaskets around the edges
   All of the above



parker125

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

.80 or higher

Answer to Question 2

Be matched with a wall assembly of the same
STC rating



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Prostaglandins were first isolated from human semen in Sweden in the 1930s. They were so named because the researcher thought that they came from the prostate gland. In fact, prostaglandins exist and are synthesized in almost every cell of the body.

Did you know?

The top five reasons that children stay home from school are as follows: colds, stomach flu (gastroenteritis), ear infection (otitis media), pink eye (conjunctivitis), and sore throat.

Did you know?

Russia has the highest death rate from cardiovascular disease followed by the Ukraine, Romania, Hungary, and Poland.

Did you know?

Historic treatments for rheumatoid arthritis have included gold salts, acupuncture, a diet consisting of apples or rhubarb, nutmeg, nettles, bee venom, bracelets made of copper, prayer, rest, tooth extractions, fasting, honey, vitamins, insulin, snow collected on Christmas, magnets, and electric convulsion therapy.

Did you know?

About one in five American adults and teenagers have had a genital herpes infection—and most of them don't know it. People with genital herpes have at least twice the risk of becoming infected with HIV if exposed to it than those people who do not have genital herpes.

For a complete list of videos, visit our video library