
Use the information in Table 14.1. If the plant has no limits on the number of units produced by part time, overtime, or subcontractors, what is the lowest-cost chase plan that is possible for the six-month period?
◦ Between $150,000 and $200,000
◦ Between $100,000 and $150,000
◦ Between $50,000 and $100,000
◦ Less than $50,000