Author Question: A data line has been diagnosed as being shorted to ground. Which of these would be the next step in ... (Read 31 times)

SO00

  • Hero Member
  • *****
  • Posts: 568
A data line has been diagnosed as being shorted to ground. Which of these would be the next step in diagnosing this problem?
 
  A) Replace the BCM
  B) Unplug modules one at a time and re-test the data line
  C) Replace the alternator
  D) Disconnect the battery and then test the data line

Question 2

Technician A says that maintenance-free batteries use a large amount of water. Technician B says that maintenance-free batteries use materials that reduce the amount of water used by the battery. Which technician is correct?
 
  A) Technician A only B) Technician B only
  C) Both technicians A and B D) Neither technician A nor B



karmakat49

  • Sr. Member
  • ****
  • Posts: 369
Answer to Question 1

B

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The average office desk has 400 times more bacteria on it than a toilet.

Did you know?

As the western states of America were settled, pioneers often had to drink rancid water from ponds and other sources. This often resulted in chronic diarrhea, causing many cases of dehydration and death that could have been avoided if clean water had been available.

Did you know?

Approximately 15–25% of recognized pregnancies end in miscarriage. However, many miscarriages often occur before a woman even knows she is pregnant.

Did you know?

The modern decimal position system was the invention of the Hindus (around 800 AD), involving the placing of numerals to indicate their value (units, tens, hundreds, and so on).

Did you know?

Approximately 70% of expectant mothers report experiencing some symptoms of morning sickness during the first trimester of pregnancy.

For a complete list of videos, visit our video library