This topic contains a solution. Click here to go to the answer

Author Question: Which of the following is true about generating alternatives in binary optimization? a. If the ... (Read 70 times)

jlmhmf

  • Hero Member
  • *****
  • Posts: 552
Which of the following is true about generating alternatives in binary optimization?
 a. If the second-best solution is very close to optimal, it is always preferred over the true optimal solution because of factors outside the model.
  b. If alternative solutions exist, it would not help management because some factors that make one alternative are not preferred over the factors that make another alternative.
  c. If the solution is a unique optimal solution, it would be good for management to know how much worse the second-best solution is than the unique optimal solution.
  d. If any alternative solution exists, it would only be a second-best next to the optimal solution because there is no third-best or an alternative second-best solution to any binary integer programming problem.

Question 2

A procedure for using sample data to find the estimated regression equation is
 a. point estimation. b. interval estimation.
  c. the least squares method. d. extrapolation.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

brbarasa

  • Sr. Member
  • ****
  • Posts: 308
Answer to Question 1

c
RATIONALE: If alternative optimal solutions exist, it would be good for management to know this because some factors that make one alternative preferred over another might not be included in the model. Also, if the solution is a unique optimal solution, it would be good to know how much worse the second-best solution is than the unique optimal solution. If the second-best solution is very close to optimal, it might be preferred over the true optimal solution because of factors outside the model. There could be a third-best solution or an alternative second-best solution to a binary optimization problem.

Answer to Question 2

c
RATIONALE: The least squares method is a procedure for using sample data to find the estimated regression equation.




jlmhmf

  • Member
  • Posts: 552
Reply 2 on: Jun 24, 2018
YES! Correct, THANKS for helping me on my review


lkanara2

  • Member
  • Posts: 329
Reply 3 on: Yesterday
Gracias!

 

Did you know?

Approximately one in three babies in the United States is now delivered by cesarean section. The number of cesarean sections in the United States has risen 46% since 1996.

Did you know?

Patients who cannot swallow may receive nutrition via a parenteral route—usually, a catheter is inserted through the chest into a large vein going into the heart.

Did you know?

There can actually be a 25-hour time difference between certain locations in the world. The International Date Line passes between the islands of Samoa and American Samoa. It is not a straight line, but "zig-zags" around various island chains. Therefore, Samoa and nearby islands have one date, while American Samoa and nearby islands are one day behind. Daylight saving time is used in some islands, but not in others—further shifting the hours out of sync with natural time.

Did you know?

According to research, pregnant women tend to eat more if carrying a baby boy. Male fetuses may secrete a chemical that stimulates their mothers to step up her energy intake.

Did you know?

Medication errors are three times higher among children and infants than with adults.

For a complete list of videos, visit our video library