Author Question: The earliest finish time for the final activity is the project duration. Indicate whether the ... (Read 136 times)

ec501234

  • Hero Member
  • *****
  • Posts: 573
The earliest finish time for the final activity is the project duration.
  Indicate whether the statement is true or false

Question 2

Regression analysis was applied between sales (in 1000s) and advertising (in 100s), and the following regression function was obtained. y = 80 + 6.2x Based on the above estimated regression line, if advertising is 10,000, then the point estimate for sales (in dollars) is _____.
 a. 62,080
  b. 142,000
  c. 700
  d. 700,000



ricroger

  • Sr. Member
  • ****
  • Posts: 352
Answer to Question 1

T

Answer to Question 2

d



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The average older adult in the United States takes five prescription drugs per day. Half of these drugs contain a sedative. Alcohol should therefore be avoided by most senior citizens because of the dangerous interactions between alcohol and sedatives.

Did you know?

Sperm cells are so tiny that 400 to 500 million (400,000,000–500,000,000) of them fit onto 1 tsp.

Did you know?

Stroke kills people from all ethnic backgrounds, but the people at highest risk for fatal strokes are: black men, black women, Asian men, white men, and white women.

Did you know?

Signs and symptoms of a drug overdose include losing consciousness, fever or sweating, breathing problems, abnormal pulse, and changes in skin color.

Did you know?

Since 1988, the CDC has reported a 99% reduction in bacterial meningitis caused by Haemophilus influenzae, due to the introduction of the vaccine against it.

For a complete list of videos, visit our video library