Author Question: The earliest finish time for the final activity is the project duration. Indicate whether the ... (Read 151 times)

ec501234

  • Hero Member
  • *****
  • Posts: 573
The earliest finish time for the final activity is the project duration.
  Indicate whether the statement is true or false

Question 2

Regression analysis was applied between sales (in 1000s) and advertising (in 100s), and the following regression function was obtained. y = 80 + 6.2x Based on the above estimated regression line, if advertising is 10,000, then the point estimate for sales (in dollars) is _____.
 a. 62,080
  b. 142,000
  c. 700
  d. 700,000



ricroger

  • Sr. Member
  • ****
  • Posts: 352
Answer to Question 1

T

Answer to Question 2

d



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

When taking monoamine oxidase inhibitors, people should avoid a variety of foods, which include alcoholic beverages, bean curd, broad (fava) bean pods, cheese, fish, ginseng, protein extracts, meat, sauerkraut, shrimp paste, soups, and yeast.

Did you know?

More than 30% of American adults, and about 12% of children utilize health care approaches that were developed outside of conventional medicine.

Did you know?

Medication errors are more common among seriously ill patients than with those with minor conditions.

Did you know?

Computer programs are available that crosscheck a new drug's possible trade name with all other trade names currently available. These programs detect dangerous similarities between names and alert the manufacturer of the drug.

Did you know?

For high blood pressure (hypertension), a new class of drug, called a vasopeptidase blocker (inhibitor), has been developed. It decreases blood pressure by simultaneously dilating the peripheral arteries and increasing the body's loss of salt.

For a complete list of videos, visit our video library