Author Question: When activity times are uncertain, a. assume they are normally distributed. b. calculate the ... (Read 96 times)

michelleunicorn

  • Hero Member
  • *****
  • Posts: 565
When activity times are uncertain,
 a. assume they are normally distributed.
  b. calculate the expected time, using (a + 4m + b)/6.
  c. use the most likely time.
  d. calculate the expected time, using (a + m + b)/3.

Question 2

In a residual plot against x that does NOT suggest we should challenge the assumptions of our regression model, we would expect to see a _____.
 a. horizontal band of points centered near 0
  b. widening band of points
  c. band of points having a slope consistent with that of the regression equation
  d. parabolic band of points



brbarasa

  • Sr. Member
  • ****
  • Posts: 308
Answer to Question 1

B

Answer to Question 2

a



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Cocaine was isolated in 1860 and first used as a local anesthetic in 1884. Its first clinical use was by Sigmund Freud to wean a patient from morphine addiction. The fictional character Sherlock Holmes was supposed to be addicted to cocaine by injection.

Did you know?

Bacteria have been found alive in a lake buried one half mile under ice in Antarctica.

Did you know?

Colchicine is a highly poisonous alkaloid originally extracted from a type of saffron plant that is used mainly to treat gout.

Did you know?

As the western states of America were settled, pioneers often had to drink rancid water from ponds and other sources. This often resulted in chronic diarrhea, causing many cases of dehydration and death that could have been avoided if clean water had been available.

Did you know?

The Romans did not use numerals to indicate fractions but instead used words to indicate parts of a whole.

For a complete list of videos, visit our video library