Author Question: Arcs in a project network indicate a. completion times. b. precedence relationships. c. ... (Read 135 times)

nenivikky

  • Hero Member
  • *****
  • Posts: 516
Arcs in a project network indicate
 a. completion times.
  b. precedence relationships.
  c. activities.
  d. the critical path.

Question 2

An ANOVA procedure is used for data obtained from four populations. Four samples, each comprised of 30 observations, were taken from the four populations. The numerator and denominator (respectively) degrees of freedom for the critical value of F are _____.
 a. 3 and 30
  b. 4 and 30
  c. 3 and 119
  d. 3 and 116



C.mcnichol98

  • Sr. Member
  • ****
  • Posts: 314
Answer to Question 1

B

Answer to Question 2

d



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Allergies play a major part in the health of children. The most prevalent childhood allergies are milk, egg, soy, wheat, peanuts, tree nuts, and seafood.

Did you know?

Though the United States has largely rejected the metric system, it is used for currency, as in 100 pennies = 1 dollar. Previously, the British currency system was used, with measurements such as 12 pence to the shilling, and 20 shillings to the pound.

Did you know?

Medication errors are three times higher among children and infants than with adults.

Did you know?

Egg cells are about the size of a grain of sand. They are formed inside of a female's ovaries before she is even born.

Did you know?

Side effects from substance abuse include nausea, dehydration, reduced productivitiy, and dependence. Though these effects usually worsen over time, the constant need for the substance often overcomes rational thinking.

For a complete list of videos, visit our video library