Author Question: If the acceptance of project A is conditional on the acceptance of project B, and vice versa, the ... (Read 69 times)

james9437

  • Hero Member
  • *****
  • Posts: 568
If the acceptance of project A is conditional on the acceptance of project B, and vice versa, the appropriate constraint to use is a
 a. multiple-choice constraint.
  b. k out of n alternatives constraint.
  c. mutually exclusive constraint.
  d. corequisite constraint.

Question 2

A company has claimed that the standard deviation of the monthly incomes of its employees is less than or equal to 120 . To test its claim, a random sample of 15 employees of the company was taken, and it was determined that the standard deviation of their incomes was 135 . At a 5 level of significance, test the company's claim.



Liamb2179

  • Sr. Member
  • ****
  • Posts: 365
Answer to Question 1

D

Answer to Question 2

H0: 2  14400
Ha: 2 > 14400 2 = 17.72 < 23.68
Do not reject H0, there is not sufficient evidence to refute the company's claim.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

On average, the stomach produces 2 L of hydrochloric acid per day.

Did you know?

Long-term mental and physical effects from substance abuse include: paranoia, psychosis, immune deficiencies, and organ damage.

Did you know?

Hyperthyroidism leads to an increased rate of metabolism and affects about 1% of women but only 0.1% of men. For most people, this increased metabolic rate causes the thyroid gland to become enlarged (known as a goiter).

Did you know?

Acetaminophen (Tylenol) in overdose can seriously damage the liver. It should never be taken by people who use alcohol heavily; it can result in severe liver damage and even a condition requiring a liver transplant.

Did you know?

The first documented use of surgical anesthesia in the United States was in Connecticut in 1844.

For a complete list of videos, visit our video library