Author Question: If the acceptance of project A is conditional on the acceptance of project B, and vice versa, the ... (Read 132 times)

james9437

  • Hero Member
  • *****
  • Posts: 568
If the acceptance of project A is conditional on the acceptance of project B, and vice versa, the appropriate constraint to use is a
 a. multiple-choice constraint.
  b. k out of n alternatives constraint.
  c. mutually exclusive constraint.
  d. corequisite constraint.

Question 2

A company has claimed that the standard deviation of the monthly incomes of its employees is less than or equal to 120 . To test its claim, a random sample of 15 employees of the company was taken, and it was determined that the standard deviation of their incomes was 135 . At a 5 level of significance, test the company's claim.



Liamb2179

  • Sr. Member
  • ****
  • Posts: 365
Answer to Question 1

D

Answer to Question 2

H0: 2  14400
Ha: 2 > 14400 2 = 17.72 < 23.68
Do not reject H0, there is not sufficient evidence to refute the company's claim.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Malaria mortality rates are falling. Increased malaria prevention and control measures have greatly improved these rates. Since 2000, malaria mortality rates have fallen globally by 60% among all age groups, and by 65% among children under age 5.

Did you know?

Between 1999 and 2012, American adults with high total cholesterol decreased from 18.3% to 12.9%

Did you know?

About 60% of newborn infants in the United States are jaundiced; that is, they look yellow. Kernicterus is a form of brain damage caused by excessive jaundice. When babies begin to be affected by excessive jaundice and begin to have brain damage, they become excessively lethargic.

Did you know?

The B-complex vitamins and vitamin C are not stored in the body and must be replaced each day.

Did you know?

In 1864, the first barbiturate (barbituric acid) was synthesized.

For a complete list of videos, visit our video library