NPV calculation need to include
 A) only sunk costs of a project.
  B) only variable costs of a project.
  C) all costs related to a project.
  D) a risk-free rate as the discount rate.

Question 2

If the discount rate increases
 A) NPV does not change.
  B) NPV rises.
  C) NPV falls.
  D) investment also increases.



frankwu0507

  • Sr. Member
  • ****
  • Posts: 322
Answer to Question 1

C

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Street names for barbiturates include reds, red devils, yellow jackets, blue heavens, Christmas trees, and rainbows. They are commonly referred to as downers.

Did you know?

Signs and symptoms of a drug overdose include losing consciousness, fever or sweating, breathing problems, abnormal pulse, and changes in skin color.

Did you know?

The Centers for Disease Control and Prevention (CDC) was originally known as the Communicable Disease Center, which was formed to fight malaria. It was originally headquartered in Atlanta, Georgia, since the Southern states faced the worst threat from malaria.

Did you know?

Amphetamine poisoning can cause intravascular coagulation, circulatory collapse, rhabdomyolysis, ischemic colitis, acute psychosis, hyperthermia, respiratory distress syndrome, and pericarditis.

Did you know?

The Babylonians wrote numbers in a system that used 60 as the base value rather than the number 10. They did not have a symbol for "zero."

For a complete list of videos, visit our video library