Author Question: NPV calculation need to include A) only sunk costs of a project. B) only variable costs of a ... (Read 81 times)

Pineappleeh

  • Hero Member
  • *****
  • Posts: 585
NPV calculation need to include
 A) only sunk costs of a project.
  B) only variable costs of a project.
  C) all costs related to a project.
  D) a risk-free rate as the discount rate.

Question 2

If the discount rate increases
 A) NPV does not change.
  B) NPV rises.
  C) NPV falls.
  D) investment also increases.



frankwu0507

  • Sr. Member
  • ****
  • Posts: 322
Answer to Question 1

C

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Patients should never assume they are being given the appropriate drugs. They should make sure they know which drugs are being prescribed, and always double-check that the drugs received match the prescription.

Did you know?

Pope Sylvester II tried to introduce Arabic numbers into Europe between the years 999 and 1003, but their use did not catch on for a few more centuries, and Roman numerals continued to be the primary number system.

Did you know?

Though the United States has largely rejected the metric system, it is used for currency, as in 100 pennies = 1 dollar. Previously, the British currency system was used, with measurements such as 12 pence to the shilling, and 20 shillings to the pound.

Did you know?

Autoimmune diseases occur when the immune system destroys its own healthy tissues. When this occurs, white blood cells cannot distinguish between pathogens and normal cells.

Did you know?

Long-term mental and physical effects from substance abuse include: paranoia, psychosis, immune deficiencies, and organ damage.

For a complete list of videos, visit our video library