Author Question: If you are evaluating projects on whether or not they meet specific criteria, what type of scoring ... (Read 43 times)

sarasara

  • Hero Member
  • *****
  • Posts: 521
If you are evaluating projects on whether or not they meet specific criteria, what type of scoring model are you most likely using?
 
  a. analytic hierarchy process
  b. net present value
  c. internal rate of return
  d. checklist

Question 2

Which product attribute is defined as one whose functionality has no effect on satisfaction either positively or negatively?
 
  a. must haves
  b. delighters
  c. linear satisfiers
  d. indifferents



nickk12214

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

d

Answer to Question 2

c



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

The U.S. Preventive Services Task Force recommends that all women age 65 years of age or older should be screened with bone densitometry.

Did you know?

Excessive alcohol use costs the country approximately $235 billion every year.

Did you know?

Signs and symptoms that may signify an eye tumor include general blurred vision, bulging eye(s), double vision, a sensation of a foreign body in the eye(s), iris defects, limited ability to move the eyelid(s), limited ability to move the eye(s), pain or discomfort in or around the eyes or eyelids, red or pink eyes, white or cloud spots on the eye(s), colored spots on the eyelid(s), swelling around the eyes, swollen eyelid(s), and general vision loss.

Did you know?

Inotropic therapy does not have a role in the treatment of most heart failure patients. These drugs can make patients feel and function better but usually do not lengthen the predicted length of their lives.

Did you know?

Although puberty usually occurs in the early teenage years, the world's youngest parents were two Chinese children who had their first baby when they were 8 and 9 years of age.

For a complete list of videos, visit our video library