Author Question: The site and facility remodeling plan is the deliverable that is produced after the________ phase. ... (Read 289 times)

swpotter12

  • Hero Member
  • *****
  • Posts: 527
The site and facility remodeling plan is the deliverable that is produced after the________ phase.
 
  A) Documentation
  B) Training
  C) Installation
  D) Support

Question 2

A small plastic box that users push across a flat surface and whose movements are translated into cursor movement on a computer display is known as a ________.
 
  A) Mouse
  B) Joystick
  C) Light pen
  D) Trackball


Juro

  • Sr. Member
  • ****
  • Posts: 337
Answer to Question 1

C

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

About 600,000 particles of skin are shed every hour by each human. If you live to age 70 years, you have shed 105 pounds of dead skin.

Did you know?

HIV testing reach is still limited. An estimated 40% of people with HIV (more than 14 million) remain undiagnosed and do not know their infection status.

Did you know?

Only one in 10 cancer deaths is caused by the primary tumor. The vast majority of cancer mortality is caused by cells breaking away from the main tumor and metastasizing to other parts of the body, such as the brain, bones, or liver.

Did you know?

Every 10 seconds, a person in the United States goes to the emergency room complaining of head pain. About 1.2 million visits are for acute migraine attacks.

Did you know?

All patients with hyperparathyroidism will develop osteoporosis. The parathyroid glands maintain blood calcium within the normal range. All patients with this disease will continue to lose calcium from their bones every day, and there is no way to prevent the development of osteoporosis as a result.

For a complete list of videos, visit our video library