This topic contains a solution. Click here to go to the answer

Author Question: Which of the following is a CMM maturity level focus area? A) repeatable, necessary processes ... (Read 40 times)

iveyjurea

  • Hero Member
  • *****
  • Posts: 555
Which of the following is a CMM maturity level focus area?
 
  A) repeatable, necessary processes
  B) defined, documented software engineering processes
  C) optimized, continuous process improvement
  D) creative, ad hoc processes

Question 2

In extracting information from large data warehouses, a data mining tool may use which of the following techniques?
 
  A) decision trees
  B) regression
  C) rule induction
  D) all of the above



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

Awesome

  • Sr. Member
  • ****
  • Posts: 280
Answer to Question 1

D

Answer to Question 2

D





 

Did you know?

Serum cholesterol testing in adults is recommended every 1 to 5 years. People with diabetes and a family history of high cholesterol should be tested even more frequently.

Did you know?

Lower drug doses for elderly patients should be used first, with titrations of the dose as tolerated to prevent unwanted drug-related pharmacodynamic effects.

Did you know?

Critical care patients are twice as likely to receive the wrong medication. Of these errors, 20% are life-threatening, and 42% require additional life-sustaining treatments.

Did you know?

The Babylonians wrote numbers in a system that used 60 as the base value rather than the number 10. They did not have a symbol for "zero."

Did you know?

Bacteria have flourished on the earth for over three billion years. They were the first life forms on the planet.

For a complete list of videos, visit our video library