This topic contains a solution. Click here to go to the answer

Author Question: Which of the following is a CMM maturity level focus area? A) repeatable, necessary processes ... (Read 93 times)

iveyjurea

  • Hero Member
  • *****
  • Posts: 555
Which of the following is a CMM maturity level focus area?
 
  A) repeatable, necessary processes
  B) defined, documented software engineering processes
  C) optimized, continuous process improvement
  D) creative, ad hoc processes

Question 2

In extracting information from large data warehouses, a data mining tool may use which of the following techniques?
 
  A) decision trees
  B) regression
  C) rule induction
  D) all of the above



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

Awesome

  • Sr. Member
  • ****
  • Posts: 280
Answer to Question 1

D

Answer to Question 2

D





 

Did you know?

Chronic marijuana use can damage the white blood cells and reduce the immune system's ability to respond to disease by as much as 40%. Without a strong immune system, the body is vulnerable to all kinds of degenerative and infectious diseases.

Did you know?

More than 2,500 barbiturates have been synthesized. At the height of their popularity, about 50 were marketed for human use.

Did you know?

It is widely believed that giving a daily oral dose of aspirin to heart attack patients improves their chances of survival because the aspirin blocks the formation of new blood clots.

Did you know?

After a vasectomy, it takes about 12 ejaculations to clear out sperm that were already beyond the blocked area.

Did you know?

Cocaine was isolated in 1860 and first used as a local anesthetic in 1884. Its first clinical use was by Sigmund Freud to wean a patient from morphine addiction. The fictional character Sherlock Holmes was supposed to be addicted to cocaine by injection.

For a complete list of videos, visit our video library