Author Question: Concrete formwork must be properly prepared so it will not _____. a. blow out b. leak c. settle ... (Read 37 times)

mia

  • Hero Member
  • *****
  • Posts: 564
Concrete formwork must be properly prepared so it will not _____.
 
  a. blow out
  b. leak
  c. settle
  d. implode

Question 2

Concrete formwork must be properly prepared so it will not _____.
 
  a. blow out
  b. leak
  c. settle
  d. implode



otokexnaru

  • Sr. Member
  • ****
  • Posts: 314
Answer to Question 1

a

Answer to Question 2

a



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question

mia

  • Hero Member
  • *****
  • Posts: 564
Both answers were spot on, thank you once again




 

Did you know?

Green tea is able to stop the scent of garlic or onion from causing bad breath.

Did you know?

Serum cholesterol testing in adults is recommended every 1 to 5 years. People with diabetes and a family history of high cholesterol should be tested even more frequently.

Did you know?

When blood is exposed to air, it clots. Heparin allows the blood to come in direct contact with air without clotting.

Did you know?

Though the United States has largely rejected the metric system, it is used for currency, as in 100 pennies = 1 dollar. Previously, the British currency system was used, with measurements such as 12 pence to the shilling, and 20 shillings to the pound.

Did you know?

There are immediate benefits of chiropractic adjustments that are visible via magnetic resonance imaging (MRI). It shows that spinal manipulation therapy is effective in decreasing pain and increasing the gaps between the vertebrae, reducing pressure that leads to pain.

For a complete list of videos, visit our video library