This topic contains a solution. Click here to go to the answer

Author Question: To prepare for construction, formwork must be properly _____. a. inventoried b. staged c. ... (Read 113 times)

EAugust

  • Hero Member
  • *****
  • Posts: 550
To prepare for construction, formwork must be properly _____.
 
  a. inventoried
  b. staged
  c. located
  d. stored

Question 2

Wood or steel frames installed between inner and outer wall forms to create window or door openings are
  called _____.
 
  a. spacers
  b. holdouts
  c. bucks
  d. lintels



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

kingfahad97

  • Sr. Member
  • ****
  • Posts: 308
Answer to Question 1

b

Answer to Question 2

c




EAugust

  • Member
  • Posts: 550
Reply 2 on: Jul 24, 2018
Thanks for the timely response, appreciate it


nyrave

  • Member
  • Posts: 344
Reply 3 on: Yesterday
Excellent

 

Did you know?

According to animal studies, the typical American diet is damaging to the liver and may result in allergies, low energy, digestive problems, and a lack of ability to detoxify harmful substances.

Did you know?

Though the United States has largely rejected the metric system, it is used for currency, as in 100 pennies = 1 dollar. Previously, the British currency system was used, with measurements such as 12 pence to the shilling, and 20 shillings to the pound.

Did you know?

There are 60,000 miles of blood vessels in every adult human.

Did you know?

There are 20 feet of blood vessels in each square inch of human skin.

Did you know?

In 2006, a generic antinausea drug named ondansetron was approved. It is used to stop nausea and vomiting associated with surgery, chemotherapy, and radiation therapy.

For a complete list of videos, visit our video library