This topic contains a solution. Click here to go to the answer

Author Question: To prepare for construction, formwork must be properly _____. a. inventoried b. staged c. ... (Read 119 times)

EAugust

  • Hero Member
  • *****
  • Posts: 550
To prepare for construction, formwork must be properly _____.
 
  a. inventoried
  b. staged
  c. located
  d. stored

Question 2

Wood or steel frames installed between inner and outer wall forms to create window or door openings are
  called _____.
 
  a. spacers
  b. holdouts
  c. bucks
  d. lintels



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

kingfahad97

  • Sr. Member
  • ****
  • Posts: 308
Answer to Question 1

b

Answer to Question 2

c




EAugust

  • Member
  • Posts: 550
Reply 2 on: Jul 24, 2018
Excellent


yeungji

  • Member
  • Posts: 319
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

Asthma attacks and symptoms usually get started by specific triggers (such as viruses, allergies, gases, and air particles). You should talk to your doctor about these triggers and find ways to avoid or get rid of them.

Did you know?

There are 60,000 miles of blood vessels in every adult human.

Did you know?

The effects of organophosphate poisoning are referred to by using the abbreviations “SLUD” or “SLUDGE,” It stands for: salivation, lacrimation, urination, defecation, GI upset, and emesis.

Did you know?

Pink eye is a term that refers to conjunctivitis, which is inflammation of the thin, clear membrane (conjunctiva) over the white part of the eye (sclera). It may be triggered by a virus, bacteria, or foreign body in the eye. Antibiotic eye drops alleviate bacterial conjunctivitis, and antihistamine allergy pills or eye drops help control allergic conjunctivitis symptoms.

Did you know?

Malaria was not eliminated in the United States until 1951. The term eliminated means that no new cases arise in a country for 3 years.

For a complete list of videos, visit our video library