Author Question: The steps to connect PVC and CPVC pipe include: A) Clean, prime, apply solvent, and fit the pipe. ... (Read 116 times)

urbanoutfitters

  • Hero Member
  • *****
  • Posts: 530
The steps to connect PVC and CPVC pipe include:
 
  A) Clean, prime, apply solvent, and fit the pipe. B) Apply the solvent and then fit the pipe.
  C) Fit, clean, prime, and apply the solvent. D) Prime, fit, and then apply solvent.

Question 2

The pressure of a saturated refrigerant can accurately be predicted:
 
  A) By multiplying the refrigerant's molecular weight times the average molecular kinetic speed.
  B) By comparing its temperature to the corresponding pressure on a pressure-temperature chart.
  C) By multiplying the ratio of liquid to vapor times the refrigerant's base saturation temperature.
  D) Only if the amount of refrigerant in the system is known.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

aburgess

  • Sr. Member
  • ****
  • Posts: 361
Answer to Question 1

A

Answer to Question 2

B




urbanoutfitters

  • Member
  • Posts: 530
Reply 2 on: Jul 24, 2018
YES! Correct, THANKS for helping me on my review


aliotak

  • Member
  • Posts: 326
Reply 3 on: Yesterday
Thanks for the timely response, appreciate it

 

Did you know?

The human body produces and destroys 15 million blood cells every second.

Did you know?

The horizontal fraction bar was introduced by the Arabs.

Did you know?

The first oncogene was discovered in 1970 and was termed SRC (pronounced "SARK").

Did you know?

The training of an anesthesiologist typically requires four years of college, 4 years of medical school, 1 year of internship, and 3 years of residency.

Did you know?

This year, an estimated 1.4 million Americans will have a new or recurrent heart attack.

For a complete list of videos, visit our video library