Author Question: Before repairing a PD meter, technicians should have a supply of ________ cloth and a set of feeler ... (Read 23 times)

storky111

  • Hero Member
  • *****
  • Posts: 561
Before repairing a PD meter, technicians should have a supply of ________ cloth and a set of feeler gauges.
 
  A) wire B) graphite C) soft, lint-free D) emery

Question 2

If a rotor's movement stops abruptly when tested with low-pressure compressed air, the ________ may need cleaning.
 
  A) bearings B) valves C) gaskets D) brackets



Cnarkel

  • Sr. Member
  • ****
  • Posts: 339
Answer to Question 1

D

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Asthma attacks and symptoms usually get started by specific triggers (such as viruses, allergies, gases, and air particles). You should talk to your doctor about these triggers and find ways to avoid or get rid of them.

Did you know?

More than 20 million Americans cite use of marijuana within the past 30 days, according to the National Survey on Drug Use and Health (NSDUH). More than 8 million admit to using it almost every day.

Did you know?

There are 60,000 miles of blood vessels in every adult human.

Did you know?

Colchicine is a highly poisonous alkaloid originally extracted from a type of saffron plant that is used mainly to treat gout.

Did you know?

Warfarin was developed as a consequence of the study of a strange bleeding disorder that suddenly occurred in cattle on the northern prairies of the United States in the early 1900s.

For a complete list of videos, visit our video library