Author Question: Before repairing a PD meter, technicians should have a supply of ________ cloth and a set of feeler ... (Read 49 times)

storky111

  • Hero Member
  • *****
  • Posts: 561
Before repairing a PD meter, technicians should have a supply of ________ cloth and a set of feeler gauges.
 
  A) wire B) graphite C) soft, lint-free D) emery

Question 2

If a rotor's movement stops abruptly when tested with low-pressure compressed air, the ________ may need cleaning.
 
  A) bearings B) valves C) gaskets D) brackets



Cnarkel

  • Sr. Member
  • ****
  • Posts: 339
Answer to Question 1

D

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

There are more bacteria in your mouth than there are people in the world.

Did you know?

If you use artificial sweeteners, such as cyclamates, your eyes may be more sensitive to light. Other factors that will make your eyes more sensitive to light include use of antibiotics, oral contraceptives, hypertension medications, diuretics, and antidiabetic medications.

Did you know?

To prove that stomach ulcers were caused by bacteria and not by stress, a researcher consumed an entire laboratory beaker full of bacterial culture. After this, he did indeed develop stomach ulcers, and won the Nobel Prize for his discovery.

Did you know?

Anti-aging claims should not ever be believed. There is no supplement, medication, or any other substance that has been proven to slow or stop the aging process.

Did you know?

Certain chemicals, after ingestion, can be converted by the body into cyanide. Most of these chemicals have been removed from the market, but some old nail polish remover, solvents, and plastics manufacturing solutions can contain these substances.

For a complete list of videos, visit our video library