This topic contains a solution. Click here to go to the answer

Author Question: What is risk analysis? How is it used? What will be an ideal ... (Read 42 times)

stock

  • Hero Member
  • *****
  • Posts: 573
What is risk analysis? How is it used?
 
  What will be an ideal response?

Question 2

Explain the rationale for investigating accidents.
 
  What will be an ideal response?



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

perkiness

  • Sr. Member
  • ****
  • Posts: 348
Answer to Question 1

Risk analysis is an analytical methodology normally associated with insurance and investments. However, risk analysis can be used to analyze the workplace, identify hazards, and develop strategies for overcoming these hazards. The risk analysis process focuses on two key questions:
(i) How frequently does a given event occur?
(ii) How severe are the consequences of a given event?

Answer to Question 2

A comprehensive accident report can help construction professionals pinpoint the cause of the accident. This information can then be used to prevent future accidents, which is the primary purpose of accident investigation.




stock

  • Member
  • Posts: 573
Reply 2 on: Jul 26, 2018
Great answer, keep it coming :)


matt95

  • Member
  • Posts: 317
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

Certain chemicals, after ingestion, can be converted by the body into cyanide. Most of these chemicals have been removed from the market, but some old nail polish remover, solvents, and plastics manufacturing solutions can contain these substances.

Did you know?

By definition, when a medication is administered intravenously, its bioavailability is 100%.

Did you know?

In the ancient and medieval periods, dysentery killed about ? of all babies before they reach 12 months of age. The disease was transferred through contaminated drinking water, because there was no way to adequately dispose of sewage, which contaminated the water.

Did you know?

The most destructive flu epidemic of all times in recorded history occurred in 1918, with approximately 20 million deaths worldwide.

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

For a complete list of videos, visit our video library