Author Question: During the planning process, a ________ is much more valuable than reading about a project or even ... (Read 101 times)

Beheh

  • Hero Member
  • *****
  • Posts: 520
During the planning process, a ________ is much more valuable than reading about a project or even interviewing people on the telephone.
 
  A) site visit B) multimedia presentation
  C) either A or B D) none of the above

Question 2

Prior to the court decision, ________, as long as law enforcement officials did not trespass onto private property in order to conduct electronic surveillance, the information gained was not protected by the Fourth Amendment.
 
  A) the USA PATRIOT Act B) Miranda v. Arizona
  C) Gideon v. Wainwright D) Griswold v. Connecticut



Natalie4ever

  • Sr. Member
  • ****
  • Posts: 335
Answer to Question 1

A

Answer to Question 2

D



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

The effects of organophosphate poisoning are referred to by using the abbreviations “SLUD” or “SLUDGE,” It stands for: salivation, lacrimation, urination, defecation, GI upset, and emesis.

Did you know?

The Romans did not use numerals to indicate fractions but instead used words to indicate parts of a whole.

Did you know?

Acetaminophen (Tylenol) in overdose can seriously damage the liver. It should never be taken by people who use alcohol heavily; it can result in severe liver damage and even a condition requiring a liver transplant.

Did you know?

During the twentieth century, a variant of the metric system was used in Russia and France in which the base unit of mass was the tonne. Instead of kilograms, this system used millitonnes (mt).

Did you know?

More than 4.4billion prescriptions were dispensed within the United States in 2016.

For a complete list of videos, visit our video library