Author Question: During the planning process, a ________ is much more valuable than reading about a project or even ... (Read 90 times)

Beheh

  • Hero Member
  • *****
  • Posts: 520
During the planning process, a ________ is much more valuable than reading about a project or even interviewing people on the telephone.
 
  A) site visit B) multimedia presentation
  C) either A or B D) none of the above

Question 2

Prior to the court decision, ________, as long as law enforcement officials did not trespass onto private property in order to conduct electronic surveillance, the information gained was not protected by the Fourth Amendment.
 
  A) the USA PATRIOT Act B) Miranda v. Arizona
  C) Gideon v. Wainwright D) Griswold v. Connecticut



Natalie4ever

  • Sr. Member
  • ****
  • Posts: 335
Answer to Question 1

A

Answer to Question 2

D



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

All patients with hyperparathyroidism will develop osteoporosis. The parathyroid glands maintain blood calcium within the normal range. All patients with this disease will continue to lose calcium from their bones every day, and there is no way to prevent the development of osteoporosis as a result.

Did you know?

The Babylonians wrote numbers in a system that used 60 as the base value rather than the number 10. They did not have a symbol for "zero."

Did you know?

Oliver Wendell Holmes is credited with introducing the words "anesthesia" and "anesthetic" into the English language in 1846.

Did you know?

Liver spots have nothing whatsoever to do with the liver. They are a type of freckles commonly seen in older adults who have been out in the sun without sufficient sunscreen.

Did you know?

The strongest synthetic topical retinoid drug available, tazarotene, is used to treat sun-damaged skin, acne, and psoriasis.

For a complete list of videos, visit our video library