Author Question: During the planning process, a ________ is much more valuable than reading about a project or even ... (Read 87 times)

Beheh

  • Hero Member
  • *****
  • Posts: 520
During the planning process, a ________ is much more valuable than reading about a project or even interviewing people on the telephone.
 
  A) site visit B) multimedia presentation
  C) either A or B D) none of the above

Question 2

Prior to the court decision, ________, as long as law enforcement officials did not trespass onto private property in order to conduct electronic surveillance, the information gained was not protected by the Fourth Amendment.
 
  A) the USA PATRIOT Act B) Miranda v. Arizona
  C) Gideon v. Wainwright D) Griswold v. Connecticut



Natalie4ever

  • Sr. Member
  • ****
  • Posts: 335
Answer to Question 1

A

Answer to Question 2

D



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

Drying your hands with a paper towel will reduce the bacterial count on your hands by 45–60%.

Did you know?

Sildenafil (Viagra®) has two actions that may be of consequence in patients with heart disease. It can lower the blood pressure, and it can interact with nitrates. It should never be used in patients who are taking nitrates.

Did you know?

Elderly adults are living longer, and causes of death are shifting. At the same time, autopsy rates are at or near their lowest in history.

Did you know?

Since 1988, the CDC has reported a 99% reduction in bacterial meningitis caused by Haemophilus influenzae, due to the introduction of the vaccine against it.

Did you know?

Multiple experimental evidences have confirmed that at the molecular level, cancer is caused by lesions in cellular DNA.

For a complete list of videos, visit our video library