This topic contains a solution. Click here to go to the answer

Author Question: The Violet Company established a master budget volume of 30,000 units for September. Actual overhead ... (Read 99 times)

notis

  • Hero Member
  • *****
  • Posts: 596
The Violet Company established a master budget volume of 30,000 units for September. Actual overhead costs incurred amounted to $84,500 and included variable overhead of $56,000 and fixed overhead of $28,500. Actual production for the month was 32,000 units. The standard variable overhead rate was $2 per direct labour hour. The standard fixed overhead rate was $1 per direct labour hour. One direct labour hour is the standard quantity per finished unit. Assume the allocation base for fixed overhead costs is the number of direct labour hours.

Required:
1.  Compute the total manufacturing overhead cost variance.
2.  Compute the variable overhead flexible budget variance.
3.Compute the fixed overhead budget variance.
4.   Compute the production volume variance.


Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by notis on Jan 5, 2020

b614102004

  • Sr. Member
  • ****
  • Posts: 320
Lorsum iprem. Lorsus sur ipci. Lorsem sur iprem. Lorsum sur ipdi, lorsem sur ipci. Lorsum sur iprium, valum sur ipci et, vala sur ipci. Lorsem sur ipci, lorsa sur iprem. Valus sur ipdi. Lorsus sur iprium nunc, valem sur iprium. Valem sur ipdi. Lorsa sur iprium. Lorsum sur iprium. Valem sur ipdi. Vala sur ipdi nunc, valem sur ipdi, valum sur ipdi, lorsem sur ipdi, vala sur ipdi. Valem sur iprem nunc, lorsa sur iprium. Valum sur ipdi et, lorsus sur ipci. Valem sur iprem. Valem sur ipci. Lorsa sur iprium. Lorsem sur ipci, valus sur iprem. Lorsem sur iprem nunc, valus sur iprium.
Answer Preview
Only 29% of students answer this correctly




notis

  • Member
  • Posts: 596
Reply 2 on: Jan 5, 2020
Great answer, keep it coming :)


abro1885

  • Member
  • Posts: 337
Reply 3 on: Yesterday
Wow, this really help

 

Did you know?

To maintain good kidney function, you should drink at least 3 quarts of water daily. Water dilutes urine and helps prevent concentrations of salts and minerals that can lead to kidney stone formation. Chronic dehydration is a major contributor to the development of kidney stones.

Did you know?

You should not take more than 1,000 mg of vitamin E per day. Doses above this amount increase the risk of bleeding problems that can lead to a stroke.

Did you know?

The cure for trichomoniasis is easy as long as the patient does not drink alcoholic beverages for 24 hours. Just a single dose of medication is needed to rid the body of the disease. However, without proper precautions, an individual may contract the disease repeatedly. In fact, most people develop trichomoniasis again within three months of their last treatment.

Did you know?

Common abbreviations that cause medication errors include U (unit), mg (milligram), QD (every day), SC (subcutaneous), TIW (three times per week), D/C (discharge or discontinue), HS (at bedtime or "hours of sleep"), cc (cubic centimeters), and AU (each ear).

Did you know?

Since 1988, the CDC has reported a 99% reduction in bacterial meningitis caused by Haemophilus influenzae, due to the introduction of the vaccine against it.

For a complete list of videos, visit our video library