Author Question: The earliest finish time for the final activity is the project duration. Indicate whether the ... (Read 159 times)

ec501234

  • Hero Member
  • *****
  • Posts: 573
The earliest finish time for the final activity is the project duration.
  Indicate whether the statement is true or false

Question 2

Regression analysis was applied between sales (in 1000s) and advertising (in 100s), and the following regression function was obtained. y = 80 + 6.2x Based on the above estimated regression line, if advertising is 10,000, then the point estimate for sales (in dollars) is _____.
 a. 62,080
  b. 142,000
  c. 700
  d. 700,000



ricroger

  • Sr. Member
  • ****
  • Posts: 352
Answer to Question 1

T

Answer to Question 2

d



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Amphetamine poisoning can cause intravascular coagulation, circulatory collapse, rhabdomyolysis, ischemic colitis, acute psychosis, hyperthermia, respiratory distress syndrome, and pericarditis.

Did you know?

Congestive heart failure is a serious disorder that carries a reduced life expectancy. Heart failure is usually a chronic illness, and it may worsen with infection or other physical stressors.

Did you know?

The heart is located in the center of the chest, with part of it tipped slightly so that it taps against the left side of the chest.

Did you know?

According to research, pregnant women tend to eat more if carrying a baby boy. Male fetuses may secrete a chemical that stimulates their mothers to step up her energy intake.

Did you know?

Glaucoma is a leading cause of blindness. As of yet, there is no cure. Everyone is at risk, and there may be no warning signs. It is six to eight times more common in African Americans than in whites. The best and most effective way to detect glaucoma is to receive a dilated eye examination.

For a complete list of videos, visit our video library