Author Question: To determine how to crash activity times a. normal activity costs and costs under maximum crashing ... (Read 42 times)

fasfsadfdsfa

  • Hero Member
  • *****
  • Posts: 554
To determine how to crash activity times
 a. normal activity costs and costs under maximum crashing must be known.
  b. shortest times with crashing must be known.
  c. realize that new paths may become critical.
  d. All of the alternatives are true.

Question 2

The difference between the observed value of the dependent variable and the value predicted by using the estimated regression equation is called _____.
 a. the standard error
  b. a residual
  c. a prediction interval
  d. the variance



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

Chocorrol77

  • Sr. Member
  • ****
  • Posts: 313
Answer to Question 1

D

Answer to Question 2

b




fasfsadfdsfa

  • Member
  • Posts: 554
Reply 2 on: Jun 24, 2018
Thanks for the timely response, appreciate it


aruss1303

  • Member
  • Posts: 314
Reply 3 on: Yesterday
Wow, this really help

 

Did you know?

Warfarin was developed as a consequence of the study of a strange bleeding disorder that suddenly occurred in cattle on the northern prairies of the United States in the early 1900s.

Did you know?

A good example of polar molecules can be understood when trying to make a cake. If water and oil are required, they will not mix together. If you put them into a measuring cup, the oil will rise to the top while the water remains on the bottom.

Did you know?

Less than one of every three adults with high LDL cholesterol has the condition under control. Only 48.1% with the condition are being treated for it.

Did you know?

All patients with hyperparathyroidism will develop osteoporosis. The parathyroid glands maintain blood calcium within the normal range. All patients with this disease will continue to lose calcium from their bones every day, and there is no way to prevent the development of osteoporosis as a result.

Did you know?

After a vasectomy, it takes about 12 ejaculations to clear out sperm that were already beyond the blocked area.

For a complete list of videos, visit our video library