Author Question: Set up a construction project flow system so that all parties are assured of payment and adequate ... (Read 117 times)

lidoalex

  • Hero Member
  • *****
  • Posts: 538
Set up a construction project flow system so that all parties are assured of payment and adequate performance.

Question 2

A lease of premises that violate the city fire code is:
 A) Void.
 B) Valid as long as the premises are habitable.
 C) Valid as long as the tenant is warned.
 D) Valid until the tenant is aware of the code problems.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

IRincones

  • Sr. Member
  • ****
  • Posts: 321
Answer to Question 1

Students should use third party/architect's certificate system; retainage should be used; flowdown clause for general; payment and performance bonds.

Answer to Question 2

A





 

Did you know?

Pope Sylvester II tried to introduce Arabic numbers into Europe between the years 999 and 1003, but their use did not catch on for a few more centuries, and Roman numerals continued to be the primary number system.

Did you know?

Pubic lice (crabs) are usually spread through sexual contact. You cannot catch them by using a public toilet.

Did you know?

Methicillin-resistant Staphylococcus aureus or MRSA was discovered in 1961 in the United Kingdom. It if often referred to as a superbug. MRSA infections cause more deaths in the United States every year than AIDS.

Methicilli ...
Did you know?

Vampire bats have a natural anticoagulant in their saliva that permits continuous bleeding after they painlessly open a wound with their incisors. This capillary blood does not cause any significant blood loss to their victims.

Did you know?

If you could remove all of your skin, it would weigh up to 5 pounds.

For a complete list of videos, visit our video library