Author Question: Direct manufacturing labor and direct materials variances, missing data. (CMA, heavily adapted) ... (Read 172 times)

go.lag

  • Hero Member
  • *****
  • Posts: 667
Direct manufacturing labor and direct materials variances, missing data.
 
  (CMA, heavily adapted) Young Bay Surfboards manufactures fiberglass surfboards. The standard cost of direct materials and direct manufacturing labor is 223 per board. This includes 40 pounds of direct materials, at the budgeted price of 2 per pound, and 10 hours of direct manufacturing labor, at the budgeted rate of 14.30 per hour. Following are additional data for the month of July:
 
  There were no beginning inventories.
 
  Required:
  1. Compute direct manufacturing labor variances for July.
  2. Compute the actual pounds of direct materials used in production in July.
  3. Calculate the actual price per pound of direct materials purchased.
  4. Calculate the direct materials price variance.

Question 2

Failure to record the adjusting entry for depreciation will overstate assets on the balance sheet.
  Indicate whether the statement is true or false



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

Athena23

  • Sr. Member
  • ****
  • Posts: 305
Answer to Question 1

1.
Flexible Budget
(Budgeted Input
Actual Costs Qty. Allowed for
Incurred (Actual Actual Input Qty. Actual Output
Input Qty. Actual Price)  Budgeted Price  Budgeted Price)
Direct mfg. labor 594,500a 586,300b 786,500c

8,200 U 200,200 F
Price variance Efficiency variance

192,000 F
Flexible-budget variance

a Given (or 41,000 hours  14.50/hour)
b 41,000 hours  14.30/hour = 735,000
c 5,500 units  10 hours/unit  14.30/hour = 786,500

2. The favorable direct materials efficiency variance of 1,700 indicates that fewer pounds of direct materials were actually used than the budgeted quantity allowed for actual output.

=

= 850 pounds

Budgeted pounds allowed for the output achieved = 5,500  40 = 220,000 pounds

Actual pounds of direct materials used = 220,000  850 = 219,150 pounds

3. Actual price paid per pound = 432,000/160,000
= 2.70 per pound

4. Actual Costs Incurred Actual Input
(Actual Input  Actual Price) Budgeted Price
432,000a 320,000b

112,000 U
Price variance

a Given
b 160,000 pounds  2/pound = 320,000

Answer to Question 2

T




go.lag

  • Member
  • Posts: 667
Reply 2 on: Jul 6, 2018
Gracias!


mochi09

  • Member
  • Posts: 335
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

Only one in 10 cancer deaths is caused by the primary tumor. The vast majority of cancer mortality is caused by cells breaking away from the main tumor and metastasizing to other parts of the body, such as the brain, bones, or liver.

Did you know?

Your heart beats over 36 million times a year.

Did you know?

Aspirin may benefit 11 different cancers, including those of the colon, pancreas, lungs, prostate, breasts, and leukemia.

Did you know?

To prove that stomach ulcers were caused by bacteria and not by stress, a researcher consumed an entire laboratory beaker full of bacterial culture. After this, he did indeed develop stomach ulcers, and won the Nobel Prize for his discovery.

Did you know?

IgA antibodies protect body surfaces exposed to outside foreign substances. IgG antibodies are found in all body fluids. IgM antibodies are the first type of antibody made in response to an infection. IgE antibody levels are often high in people with allergies. IgD antibodies are found in tissues lining the abdomen and chest.

For a complete list of videos, visit our video library