Which of the following is NOT a fact about JAD?
 
  A) It was started in the late 1970s by Google.
  B) It brings together key users of the system.
  C) The result is highly structured.
  D) It helps to resolve conflicts.

Question 2

Define and describe the PERT technique.
 
  What will be an ideal response?



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

ankilker

  • Sr. Member
  • ****
  • Posts: 328
Answer to Question 1

A

Answer to Question 2

PERT (Program Evaluation Review Technique; Concept) is a technique that uses optimistic, pessimistic, and realistic time estimates to calculate the expected time for a particular task. This technique can help you to obtain a better time estimate when there is some uncertainty as to how much time a task will require to be completed. The optimistic (o) and pessimistic (p) times reflect the minimum and maximum possible periods of time for an activity to be completed. The realistic (r) time, or most likely time, reflects the project manager's best guess of the amount of time the activity actually will require for completion. Once each of these estimates is made for an activity, an expected time (ET) can be calculated. Because the expected completion time should be closest to the realistic (r) time, it is typically weighted four times more than the optimistic (o) and pessimistic (p) times. Once you add these values together, it must be divided by six to determine the ET. This equation is shown in the following formula:
ET = (o + 4r + p)/6 where ET = expected time for the completion for an activity; o = optimistic completion time for an activity; r = realistic completion time for an activity; p = pessimistic completion time for an activity.




Pineapplelove6

  • Member
  • Posts: 560
Reply 2 on: Jul 7, 2018
Wow, this really help


adammoses97

  • Member
  • Posts: 337
Reply 3 on: Yesterday
Thanks for the timely response, appreciate it

 

Did you know?

Street names for barbiturates include reds, red devils, yellow jackets, blue heavens, Christmas trees, and rainbows. They are commonly referred to as downers.

Did you know?

Egg cells are about the size of a grain of sand. They are formed inside of a female's ovaries before she is even born.

Did you know?

The first oral chemotherapy drug for colon cancer was approved by FDA in 2001.

Did you know?

The human body's pharmacokinetics are quite varied. Our hair holds onto drugs longer than our urine, blood, or saliva. For example, alcohol can be detected in the hair for up to 90 days after it was consumed. The same is true for marijuana, cocaine, ecstasy, heroin, methamphetamine, and nicotine.

Did you know?

The familiar sounds of your heart are made by the heart's valves as they open and close.

For a complete list of videos, visit our video library