Which of the following is NOT a fact about JAD?
 
  A) It was started in the late 1970s by Google.
  B) It brings together key users of the system.
  C) The result is highly structured.
  D) It helps to resolve conflicts.

Question 2

Define and describe the PERT technique.
 
  What will be an ideal response?



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

ankilker

  • Sr. Member
  • ****
  • Posts: 328
Answer to Question 1

A

Answer to Question 2

PERT (Program Evaluation Review Technique; Concept) is a technique that uses optimistic, pessimistic, and realistic time estimates to calculate the expected time for a particular task. This technique can help you to obtain a better time estimate when there is some uncertainty as to how much time a task will require to be completed. The optimistic (o) and pessimistic (p) times reflect the minimum and maximum possible periods of time for an activity to be completed. The realistic (r) time, or most likely time, reflects the project manager's best guess of the amount of time the activity actually will require for completion. Once each of these estimates is made for an activity, an expected time (ET) can be calculated. Because the expected completion time should be closest to the realistic (r) time, it is typically weighted four times more than the optimistic (o) and pessimistic (p) times. Once you add these values together, it must be divided by six to determine the ET. This equation is shown in the following formula:
ET = (o + 4r + p)/6 where ET = expected time for the completion for an activity; o = optimistic completion time for an activity; r = realistic completion time for an activity; p = pessimistic completion time for an activity.




Pineapplelove6

  • Member
  • Posts: 560
Reply 2 on: Jul 7, 2018
YES! Correct, THANKS for helping me on my review


sultana.d

  • Member
  • Posts: 320
Reply 3 on: Yesterday
Wow, this really help

 

Did you know?

The FDA recognizes 118 routes of administration.

Did you know?

Side effects from substance abuse include nausea, dehydration, reduced productivitiy, and dependence. Though these effects usually worsen over time, the constant need for the substance often overcomes rational thinking.

Did you know?

To prove that stomach ulcers were caused by bacteria and not by stress, a researcher consumed an entire laboratory beaker full of bacterial culture. After this, he did indeed develop stomach ulcers, and won the Nobel Prize for his discovery.

Did you know?

Many of the drugs used by neuroscientists are derived from toxic plants and venomous animals (such as snakes, spiders, snails, and puffer fish).

Did you know?

Nearly all drugs pass into human breast milk. How often a drug is taken influences the amount of drug that will pass into the milk. Medications taken 30 to 60 minutes before breastfeeding are likely to be at peak blood levels when the baby is nursing.

For a complete list of videos, visit our video library