Author Question: The longest path in a project is the ________ that determines the shortest time required to complete ... (Read 132 times)

Mimi

  • Hero Member
  • *****
  • Posts: 542
The longest path in a project is the ________ that determines the shortest time required to complete the project.
 
  A) critical path
  B) shortest route
  C) shortcut
  D) road map

Question 2

Distinguish between tacit and explicit knowledge.
 
  What will be an ideal response?



jasonq

  • Sr. Member
  • ****
  • Posts: 335
Answer to Question 1

A

Answer to Question 2

Tacit knowledge exists within a person's mind and is private and unique to each person. Explicit knowledge has been articulated, codified, and made public.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Cucumber slices relieve headaches by tightening blood vessels, reducing blood flow to the area, and relieving pressure.

Did you know?

When blood is exposed to air, it clots. Heparin allows the blood to come in direct contact with air without clotting.

Did you know?

Walt Disney helped combat malaria by making an animated film in 1943 called The Winged Scourge. This short film starred the seven dwarfs and taught children that mosquitos transmit malaria, which is a very bad disease. It advocated the killing of mosquitos to stop the disease.

Did you know?

Patients should never assume they are being given the appropriate drugs. They should make sure they know which drugs are being prescribed, and always double-check that the drugs received match the prescription.

Did you know?

The Centers for Disease Control and Prevention (CDC) was originally known as the Communicable Disease Center, which was formed to fight malaria. It was originally headquartered in Atlanta, Georgia, since the Southern states faced the worst threat from malaria.

For a complete list of videos, visit our video library