The longest path in a project is the ________ that determines the shortest time required to complete the project.
 
  A) critical path
  B) shortest route
  C) shortcut
  D) road map

Question 2

Distinguish between tacit and explicit knowledge.
 
  What will be an ideal response?



jasonq

  • Sr. Member
  • ****
  • Posts: 335
Answer to Question 1

A

Answer to Question 2

Tacit knowledge exists within a person's mind and is private and unique to each person. Explicit knowledge has been articulated, codified, and made public.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The FDA recognizes 118 routes of administration.

Did you know?

Coca-Cola originally used coca leaves and caffeine from the African kola nut. It was advertised as a therapeutic agent and "pickerupper." Eventually, its formulation was changed, and the coca leaves were removed because of the effects of regulation on cocaine-related products.

Did you know?

Studies show that systolic blood pressure can be significantly lowered by taking statins. In fact, the higher the patient's baseline blood pressure, the greater the effect of statins on his or her blood pressure.

Did you know?

The heart is located in the center of the chest, with part of it tipped slightly so that it taps against the left side of the chest.

Did you know?

According to the American College of Allergy, Asthma & Immunology, more than 50 million Americans have some kind of food allergy. Food allergies affect between 4 and 6% of children, and 4% of adults, according to the CDC. The most common food allergies include shellfish, peanuts, walnuts, fish, eggs, milk, and soy.

For a complete list of videos, visit our video library