Author Question: Program evaluation can be used for which of the following? a. Influence people in the programs ... (Read 58 times)

yoooooman

  • Hero Member
  • *****
  • Posts: 557
Program evaluation can be used for which of the following?
 
  a. Influence people in the programs external political environment.
  b. Study the programs operations and effects.
  c. Control the behavior of the people responsible for program implementation.
  d. All of the above.

Question 2

The specific type of policy analysis best suited to broad-gauged problems is
 
  a. issue analysis.
  b. strategic analysis.
  c. program analysis.
  d. multiprogram analysis.
  e. prismatic analysis.



duy1981999

  • Sr. Member
  • ****
  • Posts: 341
Answer to Question 1

ANS: D

Answer to Question 2

ANS: B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

For high blood pressure (hypertension), a new class of drug, called a vasopeptidase blocker (inhibitor), has been developed. It decreases blood pressure by simultaneously dilating the peripheral arteries and increasing the body's loss of salt.

Did you know?

There are 60,000 miles of blood vessels in every adult human.

Did you know?

Acute bronchitis is an inflammation of the breathing tubes (bronchi), which causes increased mucus production and other changes. It is usually caused by bacteria or viruses, can be serious in people who have pulmonary or cardiac diseases, and can lead to pneumonia.

Did you know?

In ancient Rome, many of the richer people in the population had lead-induced gout. The reason for this is unclear. Lead poisoning has also been linked to madness.

Did you know?

The Babylonians wrote numbers in a system that used 60 as the base value rather than the number 10. They did not have a symbol for "zero."

For a complete list of videos, visit our video library