Author Question: Concrete formwork must be properly prepared so it will not _____. a. blow out b. leak c. settle ... (Read 48 times)

mia

  • Hero Member
  • *****
  • Posts: 564
Concrete formwork must be properly prepared so it will not _____.
 
  a. blow out
  b. leak
  c. settle
  d. implode

Question 2

Concrete formwork must be properly prepared so it will not _____.
 
  a. blow out
  b. leak
  c. settle
  d. implode



otokexnaru

  • Sr. Member
  • ****
  • Posts: 314
Answer to Question 1

a

Answer to Question 2

a



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question

mia

  • Hero Member
  • *****
  • Posts: 564
Both answers were spot on, thank you once again




 

Did you know?

This year, an estimated 1.4 million Americans will have a new or recurrent heart attack.

Did you know?

Carbamazepine can interfere with the results of home pregnancy tests. If you are taking carbamazepine, do not try to test for pregnancy at home.

Did you know?

Congestive heart failure is a serious disorder that carries a reduced life expectancy. Heart failure is usually a chronic illness, and it may worsen with infection or other physical stressors.

Did you know?

The shortest mature adult human of whom there is independent evidence was Gul Mohammed in India. In 1990, he was measured in New Delhi and stood 22.5 inches tall.

Did you know?

When Gabriel Fahrenheit invented the first mercury thermometer, he called "zero degrees" the lowest temperature he was able to attain with a mixture of ice and salt. For the upper point of his scale, he used 96°, which he measured as normal human body temperature (we know it to be 98.6° today because of more accurate thermometers).

For a complete list of videos, visit our video library