This topic contains a solution. Click here to go to the answer

Author Question: A vapor barrier should be installed between loose-fill insulation and the finished ceiling _____. ... (Read 96 times)

D2AR0N

  • Hero Member
  • *****
  • Posts: 561
A vapor barrier should be installed between loose-fill insulation and the finished ceiling _____.
 
  a. to keep the fill from settling
  b. to prevent moisture from penetrating the insulation
  c. to discourage mice from nesting in the fill
  d. to prevent moisture from penetrating the finished ceiling

Question 2

When installing rigid insulation, a preferred fastening method is_____.
 
  a. stapling
  b. construction adhesive
  c. nails or screws with large washers
  d. drywall screws



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

mcni194

  • Sr. Member
  • ****
  • Posts: 311
Answer to Question 1

b

Answer to Question 2

c




D2AR0N

  • Member
  • Posts: 561
Reply 2 on: Jul 24, 2018
Excellent


Jsherida

  • Member
  • Posts: 314
Reply 3 on: Yesterday
Thanks for the timely response, appreciate it

 

Did you know?

The strongest synthetic topical retinoid drug available, tazarotene, is used to treat sun-damaged skin, acne, and psoriasis.

Did you know?

By definition, when a medication is administered intravenously, its bioavailability is 100%.

Did you know?

In most cases, kidneys can recover from almost complete loss of function, such as in acute kidney (renal) failure.

Did you know?

Acetaminophen (Tylenol) in overdose can seriously damage the liver. It should never be taken by people who use alcohol heavily; it can result in severe liver damage and even a condition requiring a liver transplant.

Did you know?

Your chance of developing a kidney stone is 1 in 10. In recent years, approximately 3.7 million people in the United States were diagnosed with a kidney disease.

For a complete list of videos, visit our video library