This topic contains a solution. Click here to go to the answer

Author Question: A vapor barrier should be installed between loose-fill insulation and the finished ceiling _____. ... (Read 34 times)

D2AR0N

  • Hero Member
  • *****
  • Posts: 561
A vapor barrier should be installed between loose-fill insulation and the finished ceiling _____.
 
  a. to keep the fill from settling
  b. to prevent moisture from penetrating the insulation
  c. to discourage mice from nesting in the fill
  d. to prevent moisture from penetrating the finished ceiling

Question 2

When installing rigid insulation, a preferred fastening method is_____.
 
  a. stapling
  b. construction adhesive
  c. nails or screws with large washers
  d. drywall screws



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

mcni194

  • Sr. Member
  • ****
  • Posts: 311
Answer to Question 1

b

Answer to Question 2

c




D2AR0N

  • Member
  • Posts: 561
Reply 2 on: Jul 24, 2018
Wow, this really help


6ana001

  • Member
  • Posts: 311
Reply 3 on: Yesterday
YES! Correct, THANKS for helping me on my review

 

Did you know?

Women are 50% to 75% more likely than men to experience an adverse drug reaction.

Did you know?

Approximately one in four people diagnosed with diabetes will develop foot problems. Of these, about one-third will require lower extremity amputation.

Did you know?

The U.S. Preventive Services Task Force recommends that all women age 65 years of age or older should be screened with bone densitometry.

Did you know?

There are 60,000 miles of blood vessels in every adult human.

Did you know?

The Romans did not use numerals to indicate fractions but instead used words to indicate parts of a whole.

For a complete list of videos, visit our video library