Author Question: Which phase of the construction workflow requires the contractor to determine the work requirements? ... (Read 69 times)

Pineapplelove6

  • Hero Member
  • *****
  • Posts: 560
Which phase of the construction workflow requires the contractor to determine the work requirements?
 
  A) Bidding
  B) Pre-construction
  C) Construction
  D) Closeout

Question 2

The _____ document guarantees the contractor will complete the work.
 
  A) bid bond
  B) project contract
  C) statement of work acceptance
  D) performance and payment bond



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

ecox1012

  • Sr. Member
  • ****
  • Posts: 344
Answer to Question 1

Answer: A

Answer to Question 2

Answer: D




Pineapplelove6

  • Member
  • Posts: 560
Reply 2 on: Jul 24, 2018
:D TYSM


CAPTAINAMERICA

  • Member
  • Posts: 325
Reply 3 on: Yesterday
Thanks for the timely response, appreciate it

 

Did you know?

Street names for barbiturates include reds, red devils, yellow jackets, blue heavens, Christmas trees, and rainbows. They are commonly referred to as downers.

Did you know?

The most common treatment options for addiction include psychotherapy, support groups, and individual counseling.

Did you know?

Multiple experimental evidences have confirmed that at the molecular level, cancer is caused by lesions in cellular DNA.

Did you know?

When Gabriel Fahrenheit invented the first mercury thermometer, he called "zero degrees" the lowest temperature he was able to attain with a mixture of ice and salt. For the upper point of his scale, he used 96°, which he measured as normal human body temperature (we know it to be 98.6° today because of more accurate thermometers).

Did you know?

In 2010, opiate painkllers, such as morphine, OxyContin®, and Vicodin®, were tied to almost 60% of drug overdose deaths.

For a complete list of videos, visit our video library