Author Question: If a contractor begins work before the construction mortgage is recorded, the contractor's lien has ... (Read 125 times)

ap345

  • Hero Member
  • *****
  • Posts: 537
If a contractor begins work before the construction mortgage is recorded, the contractor's lien has priority over that mortgage.
  Indicate whether the statement is true or false

Question 2

If a trustee is not elected by creditors, an interim trustee will be appointed by the court.
  Indicate whether the statement is true or false



ririgirl15

  • Sr. Member
  • ****
  • Posts: 385
Answer to Question 1

TRUE

Answer to Question 2

TRUE



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

For high blood pressure (hypertension), a new class of drug, called a vasopeptidase blocker (inhibitor), has been developed. It decreases blood pressure by simultaneously dilating the peripheral arteries and increasing the body's loss of salt.

Did you know?

Pink eye is a term that refers to conjunctivitis, which is inflammation of the thin, clear membrane (conjunctiva) over the white part of the eye (sclera). It may be triggered by a virus, bacteria, or foreign body in the eye. Antibiotic eye drops alleviate bacterial conjunctivitis, and antihistamine allergy pills or eye drops help control allergic conjunctivitis symptoms.

Did you know?

In most cases, kidneys can recover from almost complete loss of function, such as in acute kidney (renal) failure.

Did you know?

Though the United States has largely rejected the metric system, it is used for currency, as in 100 pennies = 1 dollar. Previously, the British currency system was used, with measurements such as 12 pence to the shilling, and 20 shillings to the pound.

Did you know?

In the United States, an estimated 50 million unnecessary antibiotics are prescribed for viral respiratory infections.

For a complete list of videos, visit our video library