This topic contains a solution. Click here to go to the answer

Author Question: When connecting gauges to an already installed and operating unit with split-system installation ... (Read 49 times)

lracut11

  • Hero Member
  • *****
  • Posts: 536
When connecting gauges to an already installed and operating unit with split-system installation valves, the installation valves should be:
 
  A) Frontseated to allow the gauges to read the system pressures.
  B) Left alone.
  C) Backseated as tightly as possible to prevent refrigerant from escaping.
  D) Moved to the mid position to allow the gauges to read the system pressures.

Question 2

Ground-up aluminum can react violently with which of the following?
 
  A) CFC and HFC B) CFC C) HFC D) Oxygen



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

kilada

  • Sr. Member
  • ****
  • Posts: 311
Answer to Question 1

B

Answer to Question 2

C





 

Did you know?

In inpatient settings, adverse drug events account for an estimated one in three of all hospital adverse events. They affect approximately 2 million hospital stays every year, and prolong hospital stays by between one and five days.

Did you know?

Bacteria have been found alive in a lake buried one half mile under ice in Antarctica.

Did you know?

Autoimmune diseases occur when the immune system destroys its own healthy tissues. When this occurs, white blood cells cannot distinguish between pathogens and normal cells.

Did you know?

Aspirin is the most widely used drug in the world. It has even been recognized as such by the Guinness Book of World Records.

Did you know?

Signs and symptoms of a drug overdose include losing consciousness, fever or sweating, breathing problems, abnormal pulse, and changes in skin color.

For a complete list of videos, visit our video library