How is a split-system condensing unit installed in an area where seismic activity occurs?
a. Attach to a suitable pad with construction adhesive
b. Attach to a composite pad with lag screws
c. Attach to a concrete pad with anchor bolts
d. Attach to a concrete pad with toggle bolts
Question 2
Before installing a Tapcon screw, _____.
a. mix grout
b. mix epoxy
c. drill a pilot hole
d. insert a lag shield