Author Question: In general, the first step when preparing for shutdown and repair is to ________. A) secure all ... (Read 53 times)

dejastew

  • Hero Member
  • *****
  • Posts: 562
In general, the first step when preparing for shutdown and repair is to ________.
 
  A) secure all required work orders, permits, and PPE
  B) verify the location of the actuator to be inspected
  C) follow all company safety policies and procedures
  D) notify the control center that work is beginning

Question 2

Which of the following areas is NOT an NATE certification specialty?
 
  A) Air conditioning B) Oil furnaces
  C) Transport refrigeration D) Commercial refrigeration



brbarasa

  • Sr. Member
  • ****
  • Posts: 308
Answer to Question 1

A

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The first oncogene was discovered in 1970 and was termed SRC (pronounced "SARK").

Did you know?

In most climates, 8 to 10 glasses of water per day is recommended for adults. The best indicator for adequate fluid intake is frequent, clear urination.

Did you know?

Amphetamine poisoning can cause intravascular coagulation, circulatory collapse, rhabdomyolysis, ischemic colitis, acute psychosis, hyperthermia, respiratory distress syndrome, and pericarditis.

Did you know?

More than 50% of American adults have oral herpes, which is commonly known as "cold sores" or "fever blisters." The herpes virus can be active on the skin surface without showing any signs or causing any symptoms.

Did you know?

Hip fractures are the most serious consequences of osteoporosis. The incidence of hip fractures increases with each decade among patients in their 60s to patients in their 90s for both women and men of all populations. Men and women older than 80 years of age show the highest incidence of hip fractures.

For a complete list of videos, visit our video library