Author Question: Before repairing a PD meter, technicians should have a supply of ________ cloth and a set of feeler ... (Read 46 times)

storky111

  • Hero Member
  • *****
  • Posts: 561
Before repairing a PD meter, technicians should have a supply of ________ cloth and a set of feeler gauges.
 
  A) wire B) graphite C) soft, lint-free D) emery

Question 2

If a rotor's movement stops abruptly when tested with low-pressure compressed air, the ________ may need cleaning.
 
  A) bearings B) valves C) gaskets D) brackets



Cnarkel

  • Sr. Member
  • ****
  • Posts: 339
Answer to Question 1

D

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Alzheimer's disease affects only about 10% of people older than 65 years of age. Most forms of decreased mental function and dementia are caused by disuse (letting the mind get lazy).

Did you know?

About one in five American adults and teenagers have had a genital herpes infection—and most of them don't know it. People with genital herpes have at least twice the risk of becoming infected with HIV if exposed to it than those people who do not have genital herpes.

Did you know?

Common abbreviations that cause medication errors include U (unit), mg (milligram), QD (every day), SC (subcutaneous), TIW (three times per week), D/C (discharge or discontinue), HS (at bedtime or "hours of sleep"), cc (cubic centimeters), and AU (each ear).

Did you know?

Complications of influenza include: bacterial pneumonia, ear and sinus infections, dehydration, and worsening of chronic conditions such as asthma, congestive heart failure, or diabetes.

Did you know?

Methicillin-resistant Staphylococcus aureus or MRSA was discovered in 1961 in the United Kingdom. It if often referred to as a superbug. MRSA infections cause more deaths in the United States every year than AIDS.

Methicilli ...

For a complete list of videos, visit our video library