This topic contains a solution. Click here to go to the answer

Author Question: What types of claims could arise related to the use of Building Information Modeling software on ... (Read 47 times)

burchfield96

  • Hero Member
  • *****
  • Posts: 610
What types of claims could arise related to the use of Building Information Modeling software on construction projects?
 
  What will be an ideal response?

Question 2

Pretreatment of boiler feedwater __________________.
 
  A. consists of heating, softening and reverse osmosis treatment, and is done to limit the amount of chemicals necessary
  B. consists of chemical treatment and is used to raise the Ph of the feedwater
  C. consists of chemical treatment and is used to lower the Ph of the feedwater
  D. is only used on large boilers operating for a power utility



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

mistyjohnson

  • Sr. Member
  • ****
  • Posts: 331
Answer to Question 1

The potential types of claims that could arise related to the use of Building Information Modeling are the following:

a) Liability issues related to generating three dimensional models using drawings
from several different firms and who would be responsible for errors.
b) Disputes arising from software incompatibility and inaccurate data being
uploaded into the BIM software, as a result of incompatibility.
c) Disputes arising from changes being made after drawings are uploaded into the
three dimensional models on the two dimensional drawings.
d) Disputes from changes resulting from clashes between construction elements
designed by members of different firms.
e) Disputes resulting from how construction elements are displayed in a three
dimensional model versus how they are shown on individual engineering or shop
drawings.
f) Disputes prompted by the engineering drawings not containing all of the changes
that were made on the three dimensional model, although the three dimensional
modeling software is suppose to transpose the three dimensional model back
into accurate two dimensional drawings.

Answer to Question 2

A




burchfield96

  • Member
  • Posts: 610
Reply 2 on: Jul 26, 2018
Great answer, keep it coming :)


alvinum

  • Member
  • Posts: 317
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

Chronic necrotizing aspergillosis has a slowly progressive process that, unlike invasive aspergillosis, does not spread to other organ systems or the blood vessels. It most often affects middle-aged and elderly individuals, spreading to surrounding tissue in the lungs. The disease often does not respond to conventionally successful treatments, and requires individualized therapies in order to keep it from becoming life-threatening.

Did you know?

Women are two-thirds more likely than men to develop irritable bowel syndrome. This may be attributable to hormonal changes related to their menstrual cycles.

Did you know?

Only 12 hours after an egg cell is fertilized by a sperm cell, the egg cell starts to divide. As it continues to divide, it moves along the fallopian tube toward the uterus at about 1 inch per day.

Did you know?

Pink eye is a term that refers to conjunctivitis, which is inflammation of the thin, clear membrane (conjunctiva) over the white part of the eye (sclera). It may be triggered by a virus, bacteria, or foreign body in the eye. Antibiotic eye drops alleviate bacterial conjunctivitis, and antihistamine allergy pills or eye drops help control allergic conjunctivitis symptoms.

Did you know?

Nitroglycerin is used to alleviate various heart-related conditions, and it is also the chief component of dynamite (but mixed in a solid clay base to stabilize it).

For a complete list of videos, visit our video library